|
|
|
GUIDELINES FOR SUBMITTING A JOB DRAWING OR FIELD VERIFIED JOB
- List all Roof Slopes. If roof slopes are not known, then provide panel lengths.
- Provide all eave dimensions.
- For Gable Ends, please note whether dimension is on a slope of flat.
- Provide eave length of dormer (not sidewall length).
- On dormer sections that extend past the eave line, provide to where the valley starts on the dormer. Also state as to whether the dimension is on the slope (sidewall) or not.
- Provide a dormer side & front overhang.
- Provide distance or dormer roof corner to a corner of the main roof for proper dormer placement or from another dormer section.
- Provide distance from eave to endwall of dormer. Please note as to whether the dimension is on the slope or not.
- On dutch gables, distance from eave to gable. Please not whether dimension is on slope or not. Also specify any overhang.
|
|
|
|